Quality Control Compliance Specialist, Construction Engineering Services - Salem jobs in United States
cer-icon
Apply on Employer Site
company-logo

David Evans and Associates, Inc. · 1 day ago

Quality Control Compliance Specialist, Construction Engineering Services - Salem

David Evans and Associates, Inc. is a company focused on delivering innovative transportation solutions through engineering practices. They are seeking a Quality Control Compliance Specialist to ensure compliance with contract specifications for roadway and bridge construction, inspect materials, and maintain quality assurance documentation.

ConsultingIndustrial EngineeringProduct Design
check
Growth Opportunities
check
H1B Sponsor Likelynote

Responsibilities

Interpret contract plans and specifications for roadway and bridge construction to ensure contract compliance
Verify the quality of the field tested materials incorporated into the project by the contractor, such as soil, crushed aggregates; Portland Concrete and Asphalt Concrete are within specifications
Inspect the quality of materials being placed and the contractor methods of construction to ensure compliance to specifications
Suspend work on projects for non-specification procedures and non-specification materials until the Project Manager is notified
Communicate action taken to project inspector, PM and other appropriate personnel
Assure that the Contractors Quality Compliance program meets required standards for all projects assigned to the Project Manager’s office
Randomly inspect for proper sampling and testing procedures and confirms technician certifications
Assures product compliance samples are collected and submitted to construction section
Prepare and maintain the test summary for materials on each project including but not limited to supporting data for semifinal submittal
Review contractor’s and agency test results for completeness, accuracy and acceptability
Verify the quality and acceptability of construction materials and authorize that they be entered into the contract payment system
Ensure tests are performed, documented and submitted to the Project Manager’s office in accordance to the specifications
Review test data
Calculate price adjustments for incorporated materials
Review preliminary and advanced plans for appropriate material specifications
Read and comprehend contract plans and specifications and appropriate guidelines for roadway and bridge construction in order to ensure contractor compliance
Inspect and document work performed by contractors. Also has authority to suspend non-specification procedures until the Project Manager is notified
Check quality and quantity of materials received on the project by the contractor, such as pipe, guardrail, reinforcing steel, and landscaping items
Prepare appropriate paperwork
Measure and write pay notes for construction pay items and compute quantities
Assist the contract payments specialist with the following duties: Calculate and verify material quantities using calculators, computer, and engineering principles to determine and check field notes for correct pay and quantities
Assist the contract administrative specialist with the following duties: Prepare contract quality and quantity documentation for final submittal. Ensure all quality documentation is complete and complies with specifications. Prepare final contract quality documentation and checks final contract estimates for completeness and determination of final contract costs

Qualification

Quality Control ComplianceMaterials TestingODOT Projects ExperienceContract ComplianceCommunication SkillsAttention to Detail

Required

Minimum of 2 years experience with asphalt, concrete, aggregate, or soil materials testing

Preferred

5 years of previous experience with ODOT Quality Control/Assurance testing, or Quality Control/Assurance oversight
Experience working on ODOT projects as a Quality Control Compliance Specialist

Benefits

Comprehensive health coverage: Medical, Dental, Vision, Disability, and Life Insurance
Financial wellness: Health Savings Account (HSA) and Lifestyle Spending Account with employer contributions
Professional development: Support for continuing education and training opportunities.
Work-life balance: Paid Time Off (PTO) and Holiday Pay
Retirement: 401k plan
Wellbeing focus: Holistic Wellbeing Program centered on physical, emotional, financial, career, and community health
Growth opportunities: Access to mentorship, professional support, and pathways for career advancement

Company

David Evans and Associates, Inc.

twittertwittertwitter
company-logo
Since its founding in 1976 in Portland, Oregon, DEA has become a recognized leader for progressive and sustainable design and management solutions for complex transportation, land development, energy, and water projects nationwide.

H1B Sponsorship

David Evans and Associates, Inc. has a track record of offering H1B sponsorships. Please note that this does not guarantee sponsorship for this specific role. Below presents additional info for your reference. (Data Powered by US Department of Labor)
Distribution of Different Job Fields Receiving Sponsorship
Represents job field similar to this job
Trends of Total Sponsorships
2025 (1)
2024 (12)
2023 (3)
2022 (4)
2021 (3)
2020 (4)

Funding

Current Stage
Late Stage
Total Funding
unknown
2025-02-18Acquired

Leadership Team

leader-logo
Al Barkouli
Chairman and CEO
linkedin
leader-logo
Dave Evans
Chairman Emeritus
linkedin
Company data provided by crunchbase