Substation Communication Project Engineer jobs in United States
cer-icon
Apply on Employer Site
company-logo

HDR · 2 days ago

Substation Communication Project Engineer

HDR is a company committed to creating a welcoming environment where employees are valued and respected. The Substation Communication Project Engineer will be responsible for the technical aspects and deliverables of substation communication projects, ensuring quality and compliance with utility standards.

ArchitectureConsulting
check
Growth Opportunities
check
H1B Sponsor Likelynote

Responsibilities

Complete all technical requirements of substation communication projects of basic to moderate complexity
Support substation project scoping efforts by reviewing existing communication infrastructure, current utility standards and best practices to provide a project communication recommendation to the design team
Complete technical reviews of substation protection and control schematic diagrams from a communication and/or SCADA perspective
Develop RTU and EMS points lists and documentation of RTU data
Develop configurations for RTU’s, HMI’s, I/O devices, meters, PLC’s, communication processors, and network devices using proprietary software packages
Execute testing and troubleshooting of device configurations in a lab environment
Coordination of protective relay communication port parameters and data maps with system protection engineers
Coordination of EMS database changes with utilities
Provide technical and troubleshooting support for field technicians. This will primarily be via telephone and email, although on-site support will also be required on an as-needed basis
Responsible for quality control reviews of communication projects from peers and/or other teams on an as needed basis
Works independently and may direct, mentor, train, and/or supervise efforts of less-experienced EIT's and/or Designers
Work with Business Class Leaders to identify and develop specific technical expertise and will attend training and seminars focused on further development and understanding of complex concepts related to their discipline
May also assist with developing technical papers and/or presentations that showcase HDR’s technical capabilities at industry conferences or other events

Qualification

Substation communicationSCADA engineeringRTU configurationCommunication protocolsProfessional Engineer licenseNovatech Orion RTUSEL automation controllersGE/Harris D20 RTUCitect SCADA HMIMicrosoft OfficeProject executionTeam collaboration

Required

Bachelor's degree in Engineering
Requires professional engineering license recognized by the licensing board for the location of the position offered. Example: Professional Engineer (PE or P.Eng) license
Previous experience in project execution within the Power Market Sector
Computer skills in Microsoft Office as well as standard Power Market Sector design software. (examples include PLS CAD, AutoCAD, Plant 3D, AutoPipe, and Revit)
An attitude and commitment to being an active participant of our employee-owned culture

Preferred

Bachelor's degree in Electrical Engineering
5 years of experience in substation communication and SCADA engineering is required
Specific experience performing aspects associated with substation communication and SCADA engineering including the following: Novatech suite of Orion RTU's and associated NCD3 software
SEL suite of automation controllers including SEL-2440/2411 DPAC's, SEL-3530/3555 RTAC's and SEL-2020/2030/2032 communication processors and associated AcSELerator Quickset/Architect/RTAC and SEL-5020 software
GE/Harris D20 RTU's and associated ConfigPro and SG Config software
ACS/NTX automation controllers and RTU retrofit kits including NTX Explorer software
Novatech/Bitronics meter configuration
Schneider Electric/Modicon suite of Compact, Quantum, and M340 PLC platforms and associated Concept, Unity, and FasTrack software
Total Control/GE QuickPanels and associated QuickDesigner software
Citect SCADA HMI software
DNP, Modbus, Modbus Plus, IEC-61850/GOOSE, and Conitel protocols (TCP/IP and serial)
Basic familiarity with usage of relay test set equipment (Omicron, Manta, Doble, etc.)
Previous experience with an electric utility or architectural/engineering or engineering consulting firm desired
Some travel may be required
Local candidates are preferred

Company

HDR is an employee-owned design firm specializing in engineering, architecture, environmental and construction services. We’re ranked No.

H1B Sponsorship

HDR has a track record of offering H1B sponsorships. Please note that this does not guarantee sponsorship for this specific role. Below presents additional info for your reference. (Data Powered by US Department of Labor)
Distribution of Different Job Fields Receiving Sponsorship
Represents job field similar to this job
Trends of Total Sponsorships
2025 (3)
2024 (4)
2023 (6)
2022 (3)
2021 (5)
2020 (8)

Funding

Current Stage
Late Stage

Leadership Team

G
Galen Meysenburg
CFO
linkedin
J
Jeff Glover
Colorado Area Water Group Chief Engineer
linkedin
Company data provided by crunchbase