ERS Power Study Electrical Engineer - Remote jobs in United States
cer-icon
Apply on Employer Site
company-logo

Vertiv · 3 hours ago

ERS Power Study Electrical Engineer - Remote

Vertiv is a global leader in mission-critical infrastructure technologies for vital applications in data centers and communication networks. They are seeking an ERS Power Study Electrical Engineer to support various power system studies, perform analyses, and assist with documentation and estimates for engineering projects.

Data CenterInformation TechnologyIT InfrastructureTelecommunications
badNo H1BnoteU.S. Citizen Onlynote

Responsibilities

Support all types of power systems Typically, will work with a Sr. Power Systems Engineer to support project scope
Perform short circuit analysis, protective device coordination, and arc flash studies
Assist other engineers with all types of power systems and engineering studies
Assist in the gathering of field data and documentation as needed
Support the full range of complex engineering studies including reliability, harmonics, load flow, and reliability-centered maintenance studies
Assist with the electrical power system documentation including system configuration, equipment ratings, and settings
May support circuit and system measurements and help write reports relating to EMF, electrical load, voltage, and power quality projects
Assist in the preparation of estimates and take-offs for engineering study project proposals
Gain a working knowledge of computer software and data utilized in the conduct of power systems and engineering studies and arrange training for others as needed
Follow and assist in the development of policy and procedures for conducting power system and engineering studies

Qualification

BSEEFE examElectrical engineeringShort circuit analysisProtective device coordinationArc flash studiesEngineering studiesVerbal communicationWriting skillsOrganizational skills

Required

Graduate Engineer BSEE
Must have taken and passed the FE exam or pass the FE exam within 12 months of hire date
Requires excellent verbal and writing skills to communicate effectively with clients, field engineers, peers, and management
Requires mature judgment, responsible for assigned projects
Requires a high degree of organizational skills
Requires sound grounding in electrical engineering
Willing to work flexible hours, weekends, holidays, and night work
Regularly required to stand, walk, use hands and fingers, talk, and hear
Frequently required to sit, and work at the computer. Specific vision abilities required by this job include close vision, distance vision, basic color differentiation, and the ability to adjust focus
Valid Driver's License
Light Lifting (5 Ibs.-25 Ibs.)
Medium Lifting (30 Ibs. – 45 Ibs.)
Heavy Lifting (over 50 Ibs.)
Frequent Standing
Frequent kneeling / crawling / stooping
Frequent bending / twisting
Frequent climbing (stairs, ladders)
Frequent driving (car, van, truck)
Extreme cold (below 32•)
Extreme heat (above 100•)
Noise Level (Medium / High need to shout to be heard)
Working around moving machinery (fork-lifts, tractors)
Protective Equipment Required (earplugs, gloves, eyewear, respirator, mask, etc.)
Work outdoors (no effective protection from weather)
25% travel time required

Benefits

Medical
Dental
Vision
Disability
PTO
Holiday pay
401k

Company

Vertiv designs, builds and services critical infrastructure that enables vital applications for data centers and industrial facilities.

Funding

Current Stage
Public Company
Total Funding
$1.24B
Key Investors
Starboard ValuePlatinum Equity
2022-10-20Post Ipo Equity
2020-02-10Post Ipo Equity· $1.24B
2020-02-10IPO

Leadership Team

leader-logo
Giordano Albertazzi
Chief Executive Officer
linkedin
leader-logo
Peter Lambrecht
Vice President Sales EMEA
linkedin
Company data provided by crunchbase