RTX · 1 month ago
PLM Solution Implementation Specialist (Puerto Rico) (Hybrid)
RTX is seeking an experienced PLM Solution Implementation Specialist to support the design, deployment, and optimization of Product Lifecycle Management solutions. The role focuses on enabling Digital Thread connectivity across the enterprise by collaborating with various teams to integrate engineering processes and enhance product development.
AerospaceManufacturingSecuritySensorTelecommunications
Responsibilities
Lead full lifecycle PLM implementation activities, including requirements gathering, solution design, configuration, testing, training, and deployment, with a focus on enabling Digital Thread integration
Configure and support core PLM modules to enable connectivity between:
MBSE models and associated documentation
Bill of Materials (BOM) items (EBOM/MBOM/CBOM)
Simulation lifecycle management tools
Digital design reviews and their integration into product development workflows
CAD/ECAD data and product structures
Drive integration between PLM and upstream/downstream systems (e.g., ERP, MES, ALM, QMS) to ensure seamless data flow and process alignment
Collaborate with engineering teams to develop and implement Digital Thread strategies that connect simulation, design, and manufacturing processes through PLM tools
Develop and maintain best practices for simulation lifecycle management and integration of simulation data with PLM to enhance product development decision-making
Support integration of MBSE workflows into PLM systems to enable traceability from systems models to requirements, BOM, and other product data
Create implementation deliverables such as integration specifications, test scripts, UAT plans, training materials, and rollout plans to enable successful deployment of Digital Thread capabilities
Troubleshoot and resolve technical challenges related to Digital Thread integrations and PLM-enabled workflows
Promote the adoption of PLM solutions by addressing user needs, providing training, and aligning with Digital Engineering initiatives
Qualification
Required
Must be a U.S. Citizen
Typically requires a University Degree and minimum 8 years prior relevant experience or an Advanced Degree in a related field and minimum 5 years
3–7 years of hands-on experience implementing or supporting PLM systems (Teamcenter, Windchill, Enovia, etc.), with a focus on enabling Digital Engineering capabilities
Strong understanding of Digital Thread concepts, including MBSE integration, simulation lifecycle management, and digital design reviews
Experience with PLM integrations, data modeling, and engineering workflows that connect design, simulation, and manufacturing tools
Knowledge of SDLC/Agile methodologies and PLM best practices to deliver scalable and adaptable solutions
Proven ability to translate engineering and Digital Thread requirements into structured PLM system designs
Strong documentation, communication, and problem-solving skills to drive cross-functional collaboration
Preferred
SAFe certification (SAFe Practitioner, SAFe Scrum Master, SAFe PO/PM, or equivalent) to support Agile delivery in enterprise-scale environments
Experience with advanced PLM capabilities such as MBSE integration, simulation data management, and digital manufacturing tools
Understanding of digital twin concepts and their integration into PLM workflows
Hands-on experience with ERP (SAP) and MES/QMS integrations for enhanced process alignment
Background supporting global engineering or manufacturing organizations with a focus on Digital Engineering transformation
Benefits
Medical, dental, and vision insurance
Three weeks of vacation for newly hired employees
Generous 401(k) plan that includes employer matching funds
Participation in the Employee Scholar Program (ESP)
Life insurance and disability coverage
Employee Assistance Plan, including up to 8 free counseling sessions
Company
RTX
RTX is comprised of three market-leading businesses – Collins Aerospace, Pratt & Whitney and Raytheon – working as one to answer the biggest questions and solve the hardest problems in aerospace and defense.
Funding
Current Stage
Public CompanyTotal Funding
$3.2MKey Investors
LIFT Ecosystem Accelerator
2024-02-22Grant· $0.2M
2019-06-09Acquired
2010-01-14Grant· $3M
Leadership Team
Recent News
Business Insider
2026-01-09
Morningstar.com
2026-01-08
2026-01-08
Company data provided by crunchbase