TECO-Westinghouse · 2 days ago
Data Center Supervisor – Fiber Team
TECO-Westinghouse is seeking a Data Center Supervisor for their Fiber Team who will lead a field crew while performing hands-on fiber installation and splicing. This role involves planning and coordinating daily activities on-site, ensuring compliance with technical and safety standards, and reporting progress and quality issues to management and stakeholders.
Electrical DistributionElectronicsIndustrial EngineeringMachinery ManufacturingManufacturingProduct DesignSalesSupply Chain Management
Responsibilities
Lead a crew of fiber technicians in the installation of data cabinets, racks, and optical distribution frames (ODF) according to engineering drawings and project requirements
Plan, assign, and oversee installation of pathway support systems (basket trays, ladder racks, cable managers, waterfalls), ensuring orderly and scalable routing
Supervise and guide fiber pulling (Outside plant/Insite plant), porting, and labeling; step in as a hands-on installer when required
Oversee routing, dressing, and securing of pre-connectorized fiber and patch cords in racks, cabinets, and panels
Perform and supervise fiber splicing of single mode and multimode fibers, including high count and complex cables
Ensure proper fiber preparation, stripping, cleaning, protection, and management in splice trays, enclosures, and patch panels
Establish test plans and oversee use of Optical Time Domain Reflectometer (OTDR), Optical Loss Test Set (OLTS), light source, power meter, Visual Fault Locator (VFL), and inspection scopes to certify fiber links
Review and sign off on insertion loss, return loss, reflectance, and continuity test results; ensure they meet customer and industry standards
Interpret complex OTDR traces, diagnose network problems, perform root cause analysis, and implement corrective actions to prevent recurrence
Maintain and review accurate records of splicing, fiber assignments, tray/rack layouts, test results, and repair history
Produce and approve customer ready test reports and as-built documentation for handover and acceptance
Ensure all field activities comply with TIA/EIA, BICSI, FOA, ITU-T, NEC, OSHA, and company/client standards
Coordinate daily activities and site logistics with project managers, construction managers, general contractors, and customer representatives; provide regular status reports to management
Travel 33%
Compliance with all Company policies is required, including adherence to Company ISO 9001 Standards and compliance with Company Affirmative Action Plan and Company Safety procedures
Compliance with applicable Company policies concerning maintaining a drug free workplace is required
Regular attendance is an essential function of this position
Other functions as required (non-essential functions)
Qualification
Required
Extensive hands on experience in fiber-optic splicing, testing, and installation
Proven experience supervising field crews on data center or telecom infrastructure projects
Proficiency with fusion splicers (e.g., Fujikura, Corning) and standard fiber preparation tools
Strong ability to read and interpret network design drawings, splice schematics, rack elevations
Advanced use of OTDRs, OLTS, power meters, VFL, fiber identifiers, and inspection scopes
Associate's degree (A.A.) or equivalent or technical school
3-5 years related experience and/or training in industrial drafting, or equivalent combination of education and experience
1-3 years supervisory experience
One or more certifications: FOA CFOT / CFOS, BICSI Technician or higher (e.g., RCDD) or equivalent regional qualification, OSHA 30 (OSHA 10 minimum)
Ability to read, analyze, and interpret manufacturing drawings, repair specifications, test results, and technical journals
Ability to apply advanced mathematical concepts such as algebra, exponents, logarithms, and quadratic equations
Ability to apply common sense understanding to carry out instructions furnished in written, oral, or diagram form
Must be a self-starter with the ability to work effectively and take ownership of assigned projects in a fast-paced environment
Preferred
Bachelor's degree
Vendor or manufacturer training (e.g., Corning, Fujikura)
Experience in hyperscale or enterprise data centers or large-scale fiber projects
Company
TECO-Westinghouse
TECO-Westinghouse is a manufacturer of electric motors and generators.
H1B Sponsorship
TECO-Westinghouse has a track record of offering H1B sponsorships. Please note that this does not
guarantee sponsorship for this specific role. Below presents additional info for your
reference. (Data Powered by US Department of Labor)
Distribution of Different Job Fields Receiving Sponsorship
Represents job field similar to this job
Trends of Total Sponsorships
2025 (2)
2024 (1)
Funding
Current Stage
Growth StageRecent News
Seattle TechFlash
2025-06-03
Company data provided by crunchbase