WSP in the U.S. · 15 hours ago
Lead Electrical Engineer (Mission Critical/Data Centers)
WSP is a leading engineering and professional services firm dedicated to serving local communities. They are seeking a Lead Electrical Engineer to design complex power and building systems while leading projects and a team of electrical engineers in their New York office.
AssociationBankingE-Commerce
Responsibilities
Produce high quality technical and professional deliverables for projects and proposals
Apply deep knowledge of engineering techniques across multiple technical functions
Utilize advanced analytical and design techniques to solve technical problems
Exemplify well-developed advanced experience in electrical discipline
Lead the development of initial electrical system concepts
Develop work plans to address technical issues within project time and budget
Work within multi-discipline project teams to develop drawing and specification documents for issuance to architects, contractors and building owners
Collaborate and coordinate with internal project discipline team members, equipment vendors and manufacturers
Perform project management activities including writing proposals, establishing budgets, and managing client interactions
Design complex and large electrical medium voltage and low voltage distribution systems and electrical building systems (i.e. general power, lighting, grounding, etc.)
Survey and evaluation of existing conditions
Perform construction administration
Develop and maintain client relationships
Proven track record of upholding workplace safety and ability to abide by WSP's health, safety and drug/alcohol and harassment policies
Qualification
Required
Bachelor's degree in Electrical Engineering or Architectural Engineering with electrical building systems emphasis
7+ years of experience in designing electrical systems for the high performing commercial or industrial
Registered Professional Engineer (PE)
Experience mentoring and training others in field
Strong working knowledge of electrical systems and codes
Attention to detail, highly organized, self-starter
Preferred
Enhancing credentials (LEED, Uptime ATD, etc.) preferred
Experience with the analysis and modeling of short circuit coordination and arc flash studies
Mission Critical/Data Center experience
Experience with international projects and knowledge of international codes and standards
Benefits
Medical
Dental
Vision
Disability
Life
Retirement savings
Company
WSP in the U.S.
What if you could shape built and natural environments – and the future of those that use them? With us, you can.
H1B Sponsorship
WSP in the U.S. has a track record of offering H1B sponsorships. Please note that this does not
guarantee sponsorship for this specific role. Below presents additional info for your
reference. (Data Powered by US Department of Labor)
Distribution of Different Job Fields Receiving Sponsorship
Represents job field similar to this job
Trends of Total Sponsorships
2022 (1)
2021 (2)
Funding
Current Stage
Late StageLeadership Team
Recent News
2023-05-11
The Globe and Mail
2023-03-10
The Globe and Mail
2022-08-16
Company data provided by crunchbase