Resource Adequacy Planner III jobs in United States
cer-icon
Apply on Employer Site
company-logo

Midcontinent Independent System Operator (MISO) · 1 day ago

Resource Adequacy Planner III

Midcontinent Independent System Operator (MISO) is a key player in managing the electricity superhighway in the Central U.S., ensuring reliable power flow to millions. The Resource Adequacy Planner III will lead efforts in probabilistic modeling to assess reliability risks and capacity values while providing insights for policy development and system enhancements.

Electrical DistributionEnergyNon Profit
check
H1B Sponsor Likelynote

Responsibilities

Lead efforts to evaluate and enhance probabilistic modeling approaches to better capture reliability risks and accurately assess the capacity value of existing and emerging resources
Perform and post-process LOLE studies using tools such as PowerGEM SERVM
Analyze results to identify key drivers and future trends
Develop more advanced QA/QC verification methods to improve model accuracy and confidence in outcomes
Inform ongoing accreditation reforms, policy development, and system enhancements within Resource Adequacy
Apply technical judgment to interpret resource planning data across MISO, its members, and the broader industry
Identify trends and potential future challenges before they become operational or planning risks
Evaluate tariff and regulatory requirements for current compliance and recommend improvements to support future needs
Translate complex analytical results into concise insights for a variety of internal and external audiences
Support continuous improvement of Resource Adequacy processes

Qualification

Probabilistic modelingLOLE studiesPowerGEM SERVMTransmission planningResource adequacyTechnical judgmentData analysisClear communication

Required

Bachelor's degree in energy policy, engineering, computer science, economics, or a related technical field
At least three years of related experience

Preferred

Experience with tools such as SERVM/PLEXOS or concepts such as LOLE studies, probabilistic modeling, or transmission planning
Prior experience in resource adequacy, transmission planning, or within an ISO/RTO environment
Background in electric or power systems, capacity markets, or energy markets

Benefits

401k
Vacation
Sick and safe time
Comprehensive benefits package

Company

Midcontinent Independent System Operator (MISO)

company-logo
MISO is the electric grid operator for the central United States.

H1B Sponsorship

Midcontinent Independent System Operator (MISO) has a track record of offering H1B sponsorships. Please note that this does not guarantee sponsorship for this specific role. Below presents additional info for your reference. (Data Powered by US Department of Labor)
Distribution of Different Job Fields Receiving Sponsorship
Represents job field similar to this job
Trends of Total Sponsorships
2025 (6)
2024 (7)
2023 (17)
2022 (9)
2021 (4)
2020 (10)

Funding

Current Stage
Late Stage

Leadership Team

leader-logo
Melissa Brown
Senior Vice President and CFO
linkedin
leader-logo
Andre Porter
Senior Vice President, Chief Strategy Officer and General Counsel
linkedin
Company data provided by crunchbase