Operating Engineer (Second Shift), Obama Presidential Center jobs in United States
cer-icon
Apply on Employer Site
company-logo

Obama Foundation · 3 days ago

Operating Engineer (Second Shift), Obama Presidential Center

The Obama Foundation is dedicated to inspiring and empowering individuals to create change in their communities. The Operating Engineer will be responsible for maintaining mechanical, electrical, and safety systems at the Obama Presidential Center, ensuring efficient operation and supporting daily facility functions.

AssociationNon Profit

Responsibilities

Maintain mechanical, electrical, and life-safety systems within OPC campus; responding to abnormal conditions for daily and long-term facility care
Maintain inventory and organization of tools and equipment, coordinating with Assistant Chief Engineer for efficient stock
Operate facility systems, troubleshoot issues and perform controls maintenance
Ensure campus systems and equipment are operating efficiently, analyzing existing operating conditions to improve efficiency and cost effectiveness
Perform incident management with coinciding report development
Analyze and solve problems in a timely manner that avoids programming and operating disruptions for the Center
Perform other duties as assigned
Track and complete preventative and predictive maintenance schedules in coordination with the Operations and Maintenance team
Operate and maintain HVAC and plumbing systems by reading gauges and adjusting valves to maintain a constant flow of service aligned with sustainability standards on campus
Perform regular, scheduled maintenance and inspections to building systems to ensure that equipment is maintained in operating condition per manufacturers’ and industry standards
Clean, oil, and lubricate pumps, motors, and facility mechanical equipment; adjusting system elements to regulate operation of units as needed
Inspect and replace equipment elements as needed, reporting malfunctions, leaks, abnormal readings, or other problems to the supervisor
Undertake plumbing, painting, and minor building repairs to assist other departments and teams within the OPC, maintaining general cleanliness of the assigned work area
Utilize a work order system for day-to-day operations and planned processes to resolve issues based upon agreed campus priorities, maintaining a monthly productivity report
Utilize the building’s building automation system to monitor space temperatures, adjust temperatures as needed, compile trend logs, and operate the building
Work together with other engineers and trades to achieve the goals of the OPC

Qualification

HVAC systemsPlumbing systemsBuilding automation systemPreventative maintenanceIncident managementProblem solvingTeam collaborationFlexibility

Required

Applies knowledge of trade function to independently complete standard tasks and resolve issues involving relatively complex factors
Exhibits working proficiency in primary/routine duties of professional area; utilizes discretion and independent judgment to solve non-routine problems
Candidates typically have progressed through a registered apprenticeship program and have obtained journeyperson status in their trade
Flexibility of hours, including but not limited to early morning, late night, weekends, and holidays across campus in both indoor and outdoor environments
Ability to work out of the Obama Presidential Center in Jackson Park and/or other Obama Foundation locations in Chicago

Company

Obama Foundation

twittertwittertwitter
company-logo
The Obama Foundation is a start-up for citizenship and an ongoing project for people to shape, together, what it means to be a good citizen.

Funding

Current Stage
Growth Stage
Total Funding
$34M
Key Investors
Siegel Family EndowmentStavros Niarchos Foundation (SNF)Bank of America
2025-07-29Grant
2023-06-22Grant· $26M
2023-05-17Grant· $3M

Leadership Team

leader-logo
Michelle Obama
Founder
Company data provided by crunchbase