SIGN IN
Building Enclosure Senior Technician / Assistant Project Manager jobs in United States
cer-icon
Apply on Employer Site
company-logo

Salas O'Brien · 23 hours ago

Building Enclosure Senior Technician / Assistant Project Manager

Salas O’Brien is an employee-owned engineering and professional services firm focused on achieving impact for clients and the world. The Building Enclosure Senior Technician / Assistant Project Manager will support managers by conducting enclosure consulting and commissioning services for new construction and existing buildings, while also coordinating activities with multiple staff and ensuring quality standards are met.
Industrial EngineeringMechanical Engineering
check
Growth Opportunities
check
H1B Sponsor Likelynote

Responsibilities

Coordinate activities with multiple other staff
Assume responsibility and be accountable for all aspects of assigned tasks
Complete assignments with limited oversight, with support from other licensed professionals
Review and understand documentation and deliverables to ensure quality and company standards, contractual obligations, and schedules are met
Participate in weekly meetings (as requested by your supervisor) to review projects and issues
Assist managers with performing hands-on enclosure commissioning and consulting services including forensic investigations, condition assessments, developing designs and administer construction of building enclosure systems, which may include documenting distress, performance evaluation, diagnostic field testing, collecting data and samples, and troubleshooting details
Assist other team members with design reviews for constructability and durability
Assist others with identifying building enclosure issues / problems and verifying corrections / solutions
Assist with the preparation of professional, accurate client deliverables, including written correspondence, reports, construction documents, repair design details, project specifications, and checklists
Work directly with project teams, clients, contractors, and other architectural and engineering disciplines to assist in the resolution of building enclosure issues
Willing to perform enclosure testing activities consistent with industry standards when necessary

Qualification

Building enclosure certificationBuilding envelope consultingTechnical communication skillsProject managementDetail orientedTeam player mindsetSelf-motivated

Required

Bachelor's Degree from an accredited university in architecture, engineering, or related field
Roofing or building enclosure certification(s), engineering or architecture license preferred, otherwise demonstrating progress towards achieving relevant licensure/certifications
A minimum of 2+ years of building envelope construction and/or consulting experience would be considered in lieu of educational requirement
Familiarity with building enclosure systems/designs and interest in investigating and restoring various building enclosure systems
Able to coordinate activities with multiple other staff
Capable of achieving deadlines for project deliverables
Compelling technical, graphical, written, and verbal communication skills
Team player mindset with a willingness to proactively grow into new roles and responsibilities
Self-motivated, detail oriented, and professional conduct
Capable of prioritizing, adjusting to fluctuating demands, maintaining productive business relationships while upholding a high standard of excellence, and maintaining integrity and attention to detail
Frequently required to stand, walk, sit, and talk or hear and occasionally kneel and climb
Must be able to lift and/or move up to 50 pounds
Specific vision abilities required by this job include close vision
Ability to work outdoors in all seasons and safely work at elevated height (roofs, lifts, etc.) are required
Must also be able to operate a motor vehicle

Preferred

Certification to operate a lift is a plus, but not a prerequisite

Benefits

Medical, dental, and vision insurance
401(k) with company match
Paid time off and company holidays
Wellness programs and employee assistance resources
Professional development support

Company

Salas O'Brien

twittertwittertwitter
company-logo
Salas O'Brien is a national leading Facilities Planning, Commissioning, Construction Management and Mechanical, Electrical.

H1B Sponsorship

Salas O'Brien has a track record of offering H1B sponsorships. Please note that this does not guarantee sponsorship for this specific role. Below presents additional info for your reference. (Data Powered by US Department of Labor)
Distribution of Different Job Fields Receiving Sponsorship
Represents job field similar to this job
Trends of Total Sponsorships
2025 (15)
2024 (3)
2023 (2)

Funding

Current Stage
Late Stage
Total Funding
unknown
Key Investors
Blackstone Group
2024-01-22Private Equity

Leadership Team

leader-logo
Paul Silva
Chief Operating Officer
linkedin
leader-logo
Karl F. Frey
Retired
linkedin
Company data provided by crunchbase