Interconnection Project Engineer jobs in United States
cer-icon
Apply on Employer Site
company-logo

The AES Corporation · 2 days ago

Interconnection Project Engineer

The AES Corporation is a Fortune 500 company leading the charge in the global energy revolution. The Sr. Interconnection Project Engineer will support and lead interconnection activities through the full life cycle of development and construction of projects, ensuring successful execution of both new and acquired projects across the United States.

Utilities
check
H1B Sponsor Likelynote

Responsibilities

Support of greenfield development: review transmission system analysis, lead the identification of interconnection agencies and procedures, help lead preparation and filing interconnection requests including leading internal and external parties on preparation of technical materials, provide viability feedback to the IC Regional Lead and other internal stakeholders to support any financial and project approvals needed
Interconnection study process: lead and support the review and analysis of utility study reports; help lead tracking and reporting of results throughout process; help lead negotiation and execution of interconnection agreements and engineering and procurement agreements
Implementation of portfolio projects: lead assistance of internal groups to complete deliverables required by transmission owners to construct interconnection facilities including integrating schedules of Transmission Owner into project construction schedule
Support and lead project due diligence efforts, identify existing and potential red flags for project acquisitions

Qualification

Interconnection studiesPower flow analysisGenerator Interconnection AgreementsElectrical diagramsOpen Access Transmission TariffsRenewable energy developmentCommunication skillsTeam collaboration

Required

BS in Electrical Engineering or related field
4+ years work history in renewable or traditional energy development, utility generation development, or transmission planning
Experience working at an Electric Utility, or consultants providing services within those footprints is strongly preferred
In depth knowledge reviewing interconnection studies and familiarity with power flow models
Strong ability to analyze power flow and system impact studies for interconnection of utility scale solar, wind, and storage generating facilities
In depth knowledge of System Impact Studies (SIS) and other interconnection studies of renewable energy generating facilities in the respective region
Experienced understanding of electrical diagrams, preliminary site plans, and preparation of interconnection request packages for submittal
Awareness of transmission systems and transmission expansion plans in US
Strong knowledge of Open Access Transmission Tariffs and Generator Interconnection Procedures

Benefits

Annual bonus
Full range of medical, dental, vision, life, financial, and/or other benefits
401(k) eligibility
Various paid time off benefits, such as vacation, sick time, and parental leave

Company

The AES Corporation

twitter
company-logo
The world no longer thinks of energy as a matter of supply and demand. Now it’s a space for innovation and partnership.

H1B Sponsorship

The AES Corporation has a track record of offering H1B sponsorships. Please note that this does not guarantee sponsorship for this specific role. Below presents additional info for your reference. (Data Powered by US Department of Labor)
Distribution of Different Job Fields Receiving Sponsorship
Represents job field similar to this job
Trends of Total Sponsorships
2025 (11)
2024 (6)
2023 (8)
2022 (9)
2021 (7)
2020 (12)

Funding

Current Stage
Late Stage

Leadership Team

leader-logo
Andrés Gluski
President and Chief Executive Officer (CEO)
linkedin
leader-logo
Taylor Sloane
Chief of Staff to the CEO
linkedin
Company data provided by crunchbase