Planet Pharma ยท 6 hours ago
Staff Electrical Engineer, Product Development
Planet Pharma is a company focused on the development of medical devices, and they are seeking a Staff Electrical Engineer to provide technical expertise in product development. The role involves supporting the design and development of new and existing medical device products while ensuring compliance with quality standards and fostering innovation.
Responsibilities
Provide strong technical expertise and engineering support for the design and development of new and existing medical device products
Support current products by ensuring quality, manufacturing efficiency, supply continuity, and cost improvements
Participate in technical and cross-functional project execution while fostering a culture of innovation through the proactive generation of novel concepts for new products and enhancements to existing product performance
Understand customer needs through literature reviews, interviews, direct observation, competitive analysis, prototype evaluations, and clinical or simulated use studies
Translate these needs into engineering requirements and develop specific product, packaging, and process specifications
Apply engineering fundamentals to design robust, manufacturable products
Develop and execute test methods, including defining measurement equipment, test setups, measurement system analysis, and data analysis
Prepare detailed technical reports based on design verification, testing, and analysis for design changes and product development activities
Ensure compliance with company quality policies, procedures, and practices, as well as all applicable local, state, federal, and safety regulations
Provide technical leadership and fostering professional growth within the team
Qualification
Required
Completed Degree in Electrical Engineering
Must have firmware programming and hardware design experience
Must have design experience with board and PCB design
Analog and digital circuit design for medical devices, Low-power design for battery-operated devices
Knowledge of IEC 60601 and ISO 13485 standards EMC/EMI compliance and testing experience PCB design and layout (Altium, Alegro, OrCAD, or similar)
High-speed design and grounding/shielding techniques
Embedded systems experience (microcontrollers, firmware integration)
Communication protocols (I2C, SPI, UART, CAN, BLE)
Risk management and documentation (FMEA, design history files)
Hands-on testing and troubleshooting with lab equipment
Ability to develop test plans and execute verification protocols
Preferred
Wireless connectivity (Bluetooth, Wi-Fi)
Cybersecurity for connected medical devices
Battery management systems and charging circuits DC/DC converters and power optimization
FPGA or ASIC design exposure
Basic Python or MATLAB for data analysis
Familiarity with RTOS for embedded systems
Understanding of IEC 62366 usability engineering
Experience with Class II or III medical devices
Company
Planet Pharma
Planet Pharma is a pharmaceuticals company.
H1B Sponsorship
Planet Pharma has a track record of offering H1B sponsorships. Please note that this does not
guarantee sponsorship for this specific role. Below presents additional info for your
reference. (Data Powered by US Department of Labor)
Distribution of Different Job Fields Receiving Sponsorship
Represents job field similar to this job
Trends of Total Sponsorships
2022 (3)
2021 (5)
2020 (5)
Funding
Current Stage
Late StageLeadership Team
Company data provided by crunchbase