Project Engineer - New Haven, CT jobs in United States
cer-icon
Apply on Employer Site
company-logo

DeSimone Consulting Engineering · 16 hours ago

Project Engineer - New Haven, CT

DeSimone Consulting Engineering is a leading firm known for its innovative approach to structural design. The Project Engineer will support projects from concept through construction, utilizing design and analysis tools while collaborating with multidisciplinary teams.

ConsultingInformation Technology
check
Senior Management
check
H1B Sponsor Likelynote

Responsibilities

Perform structural design and analysis using tools such as Revit, Rhino, ETABS, and SAP
Assist in preparing drawings, calculations, and documentation for design deliverables
Coordinate with architects, clients, and other design team members to ensure design alignment
Conduct field observations and inspections under the guidance of senior engineers
Maintain accurate records of design decisions, calculations, and project documentation
Contribute to project planning and scheduling discussions with Project Managers
Apply knowledge of structural codes, standards, and materials to design solutions
Support quality assurance efforts by reviewing drawings and checking design accuracy

Qualification

Structural DesignRevitETABSSAPRhinoBuilding CodesCommunication SkillsDetail OrientedProblem SolvingTeam Skills

Required

Bachelor of Science in Structural or Civil Engineering or related field; and five (5) years of experience in design and analysis of mid to high rise buildings utilizing software packages such as ETABS, RAM, RISA, and SAFE; or
Master's degree in Structural or Civil Engineering or related field; and three (3) years of experience in design and analysis of mid to high rise buildings utilizing software packages such as ETABS, RAM, RISA, and SAFE
Three years of relevant experience in analyzing building structures using computer modeling methods and preparing structural calculations
Extensive knowledge of local and national building codes and design practices
Knowledge of standard construction practices and the ability to work with contractors to address construction issues
Experience working in Revit
Strong verbal and written communication skills
Detail oriented with strong interpersonal, problem solving and team skills

Preferred

Master's Degree in Structural or Civil Engineering or related field
EIT (Engineer in Training) certification or PE (Professional Engineer) license
Experience working in Grasshopper, a plus

Benefits

Competitive compensation
Comprehensive benefits
Mentorship
Professional development

Company

DeSimone Consulting Engineering

twittertwittertwitter
company-logo
Founded in New York City in 1969, DeSimone provides structural engineering, façade and building envelope consulting, vertical transportation consulting, forensics, detailing, fabrication-ready modeling (FRM), project controls, dispute resolution, and expert witness services across building types.

H1B Sponsorship

DeSimone Consulting Engineering has a track record of offering H1B sponsorships. Please note that this does not guarantee sponsorship for this specific role. Below presents additional info for your reference. (Data Powered by US Department of Labor)
Distribution of Different Job Fields Receiving Sponsorship
Represents job field similar to this job
Trends of Total Sponsorships
2021 (1)
2020 (9)

Funding

Current Stage
Late Stage

Leadership Team

S
Stephen DeSimone
Chairman and CEO
linkedin
Company data provided by crunchbase