Experienced Liaison Engineer jobs in United States
cer-icon
Apply on Employer Site
company-logo

Boeing ยท 1 day ago

Experienced Liaison Engineer

The Boeing Company is seeking an Experienced Liaison Engineer to join the Space Launch System program at the Louisiana Michoud Assembly Facility in New Orleans, LA. The role involves applying engineering principles to assess and resolve product/process issues, supporting Integrated Product Teams, and ensuring compliance with Boeing standards.

AerospaceIndustrial
badNo H1Bnote

Responsibilities

Applies knowledge of Boeing design principles to assess and resolve product/process issues through the product lifecycle
Analyzes, conducts root cause analysis and develops dispositions for design non-conformances
Applies engineering principles to research technical, operational and quality issues that cannot be resolved by customer and designs interim and final engineering solutions
Identifies documents, analyzes reported problems and communicates deviations that could impact design intent and safety; recommends and manages resolution
Develops and implements product/process improvements
Supports Integrated Product Teams (IPT) and participates in design reviews
Represents the engineering community in the build through post production environment
Ensures supplier and build partner compliance with Boeing standards
Develops customer correspondence for continued safe operation and maintenance of equipment
Participates in on-site disabled product repair teams and accident investigation or support team
Analyzes damage repair or structural modification to determine appropriate jacking and shoring, prevent collateral damage and assure a safe work environment
Designs interim structural repairs and conducts static strength analysis
Develops non-destructive test procedures, tools and standards
Conducts simple static strength analysis

Qualification

Material Review Board AuthorityLiaison EngineeringEngineering PrinciplesRepair ConceptsProduction EngineeringBachelor's DegreeRoot Cause AnalysisStatic Strength AnalysisNon-Destructive Testing

Required

Bachelor of Science degree in Engineering, Engineering Technology (including Manufacturing Engineering Technology), Computer Science, Engineering Data Science, Mathematics, Physics, Chemistry or non-US equivalent qualifications directly related to the work statement
5+ years of experience with Material Review Board / Liaison Engineering (MRB / LE) Authority (including participating in Material Review Board and Integrated Product Team activities related to aerospace structures)
Willing to work alternating shifts, holidays, and weekends to support customer's needs
This position requires the ability to obtain access to a National Aeronautics and Space Administration (NASA) facility

Preferred

Experience with the repair concepts including repair station processes, component repair concepts, procedures, and warranty processes and contractual agreements
Production Engineering Experience on the Space Launch Systems Program

Benefits

Health insurance
Flexible spending accounts
Health savings accounts
Retirement savings plans
Life and disability insurance programs
Programs that provide for both paid and unpaid time away from work

Company

Boeing offers commercial, defense airplanes, space, security systems, and global services.

Funding

Current Stage
Late Stage

Leadership Team

leader-logo
CJ Nothum
CEO & Executive Communications, Senior Manager
linkedin
leader-logo
Colton Engelke
CEO and Executive Communications
linkedin
Company data provided by crunchbase