LF Production Analyst jobs in United States
cer-icon
Apply on Employer Site
company-logo

Charm Sciences, Inc. · 21 hours ago

LF Production Analyst

Charm Sciences, Inc. is seeking an LF Production Analyst to join their Lateral Flow Production Management Team. This entry-level position involves manufacturing diagnostic tests for the dairy and grain industries, including preparing reagents, documenting production processes, and ensuring quality control.

AgricultureBiotechnologyFood and BeverageHealth CareMedical
check
Diversity & Inclusion
check
H1B Sponsor Likelynote

Responsibilities

Prepare and adjust reagents required for testing and production of ROSA components
Dilute necessary antibiotics in raw milk or prepare incurred grain samples and qualify using approved tests
Spray and assemble components for pre and post-production testing
Document accurately and precisely all vital information to track raw materials such as lot numbers and production dates
Present complete data for approval by management
Bag, label and seal finished product and store in proper conditions
Update SOPs as assigned to ensure procedures are current and correct

Qualification

Biochemistry degreeLateral Flow manufacturingMS Excel proficiencyGMP/GLP experienceBasic statistics understandingAttention to detail

Required

BS or equivalent in Biochemistry, related field, or equivalent experience
Proficiency with MS Excel, Word and Outlook
Excellent attention to detail

Preferred

Lateral Flow diagnostic test manufacturing experience
GMP/GLP Experience
Understanding of basic statistics

Company

Charm Sciences, Inc.

twittertwittertwitter
company-logo
Charm Sciences is a world leader provider of food safety, water quality and environmental diagnostics.

H1B Sponsorship

Charm Sciences, Inc. has a track record of offering H1B sponsorships. Please note that this does not guarantee sponsorship for this specific role. Below presents additional info for your reference. (Data Powered by US Department of Labor)
Distribution of Different Job Fields Receiving Sponsorship
Represents job field similar to this job
Trends of Total Sponsorships
2025 (1)
2022 (1)
2021 (1)

Funding

Current Stage
Growth Stage
Company data provided by crunchbase