Electrical Engineer – Data Center Construction jobs in United States
cer-icon
Apply on Employer Site
company-logo

SWJ TECHNOLOGY · 1 day ago

Electrical Engineer – Data Center Construction

SWJ Technology specializes in providing engineering, planning, and project management services across various industries. They are currently seeking an Electrical Engineer – Data Center Construction to support the design, construction, and commissioning of mission-critical data center facilities.

ConsultingIndustrial EngineeringProject Management
check
H1B Sponsor Likelynote

Responsibilities

Design, review, and oversee installation of electrical systems for data center facilities, including:
Medium- and low-voltage power distribution systems
UPS systems, battery energy storage, and backup power systems
Generators, fuel systems, and transfer switches (ATS/STS)
Power distribution units (PDUs), remote power panels (RPPs), and busway systems
Lighting, grounding, and lightning protection systems
Coordinate electrical design with mechanical, architectural, structural, and IT teams
Review construction drawings, specifications, and vendor submittals for compliance with design intent and codes
Support site activities including inspections, QA/QC, and contractor coordination
Support commissioning, integrated systems testing (IST), and final system turnover
Ensure compliance with applicable codes and standards (NEC, NFPA, IEEE, local AHJ requirements)
Participate in risk assessments, reliability studies, and value engineering exercises
Support electrical system troubleshooting during construction and early operation phases
Ensure electrical designs meet redundancy and availability requirements (N, N+1, 2N)

Qualification

Electrical EngineeringData Center ConstructionCritical Power InfrastructureElectrical Codes KnowledgeBIM / RevitAnalytical SkillsProblem-Solving SkillsCommunication SkillsAttention to Detail

Required

Bachelor's degree in Electrical Engineering or equivalent
5+ years of experience in building construction, with a strong focus on data centers or mission-critical facilities
Proven experience with critical power infrastructure and redundancy concepts
Strong knowledge of electrical codes, standards, and safety practices
Ability to read and interpret construction drawings, one-line diagrams, and technical specifications
Experience coordinating with utility providers and AHJs
Strong analytical and problem-solving skills
Ability to work in fast-paced, schedule-driven construction environments
High attention to detail and focus on reliability and safety
Strong written and verbal communication skills

Preferred

Professional Engineer (PE) license or progress toward licensure
Experience with commissioning and integrated systems testing
Familiarity with BIM / Revit, SKM, ETAP, or similar electrical modeling tools
Experience with hyperscale or colocation data center projects
Knowledge of arc-flash analysis and short-circuit studies

Company

SWJ TECHNOLOGY

twittertwitter
company-logo
SWJ TECHNOLOGY offers quality and equipment management, project management, and consulting services.

H1B Sponsorship

SWJ TECHNOLOGY has a track record of offering H1B sponsorships. Please note that this does not guarantee sponsorship for this specific role. Below presents additional info for your reference. (Data Powered by US Department of Labor)
Distribution of Different Job Fields Receiving Sponsorship
Represents job field similar to this job
Trends of Total Sponsorships
2025 (1)
2024 (2)
2023 (2)
2022 (3)
2021 (1)
2020 (3)

Funding

Current Stage
Growth Stage
Company data provided by crunchbase