SWJ TECHNOLOGY · 1 day ago
QC Mechanical Engineer– Data Center Construction
SWJ Technology specializes in providing engineering, planning, and project management services across various industries. They are currently seeking a QC Mechanical Engineer for data center construction projects, focusing on ensuring quality, compliance, and performance of mechanical systems.
ConsultingIndustrial EngineeringProject Management
Responsibilities
Implement and manage mechanical quality control activities for data center construction projects
Inspect installation of mechanical systems, including:
HVAC systems (CRAC/CRAH units, AHUs, DX and chilled water systems)
Chilled water plants, pumps, piping, valves, and heat exchangers
Cooling distribution systems (raised floor, overhead, in-row, liquid cooling)
Plumbing, drainage, and water treatment systems
Fire protection systems (sprinkler, pre-action, clean agent interfaces)
Verify compliance with construction drawings, specifications, method statements, and inspection & test plans (ITPs)
Review and approve mechanical submittals, shop drawings, and as-built documentation
Witness factory acceptance tests (FAT), site acceptance tests (SAT), pressure tests, flushing, and commissioning activities
Identify non-conformances (NCRs), track corrective actions, and verify closure
Coordinate with construction, commissioning, and design teams to resolve quality and installation issues
Support commissioning readiness, integrated systems testing (IST), and turnover documentation
Ensure compliance with applicable codes and standards (ASHRAE, SMACNA, NFPA, local building codes)
Maintain quality records, inspection reports, test results, and handover documentation
Qualification
Required
Bachelor's degree in Mechanical Engineering or equivalent
5+ years of experience in mechanical QC or construction engineering, with a strong focus on data centers or mission-critical facilities
Proven experience inspecting HVAC and cooling systems for high-density environments
Strong knowledge of QA/QC procedures, construction practices, and industry standards
Ability to read and interpret mechanical drawings, P&IDs, specifications, and schedules
Experience working with EPC contractors, subcontractors, and commissioning agents
Strong attention to detail and documentation accuracy
Proactive and solution-oriented mindset
Ability to work effectively on active construction sites
Strong communication and coordination skills
Preferred
Professional Engineer (PE) license or equivalent
Experience with commissioning and integrated systems testing (IST)
Familiarity with BIM / Revit and mechanical documentation systems
Experience with hyperscale or colocation data center projects
Quality or inspection certifications (e.g., ISO 9001, CQI, or equivalent)
Company
SWJ TECHNOLOGY
SWJ TECHNOLOGY offers quality and equipment management, project management, and consulting services.
H1B Sponsorship
SWJ TECHNOLOGY has a track record of offering H1B sponsorships. Please note that this does not
guarantee sponsorship for this specific role. Below presents additional info for your
reference. (Data Powered by US Department of Labor)
Distribution of Different Job Fields Receiving Sponsorship
Represents job field similar to this job
Trends of Total Sponsorships
2025 (1)
2024 (2)
2023 (2)
2022 (3)
2021 (1)
2020 (3)
Funding
Current Stage
Growth StageCompany data provided by crunchbase