SWJ TECHNOLOGY · 1 day ago
QC Electrical Engineer – Data Center Construction
SWJ Technology specializes in providing engineering, planning, and project management services across various industries. They are currently seeking a QC Electrical Engineer - Data Center Construction to ensure quality, compliance, and reliability of electrical installations on data center construction projects, focusing on inspection, verification, and documentation of mission-critical electrical systems.
ConsultingIndustrial EngineeringProject Management
Responsibilities
Implement and manage electrical quality control activities for data center construction projects
Inspect installation of mission-critical electrical systems, including:
Medium- and low-voltage power distribution
UPS systems, battery systems, and energy storage
Generators, fuel systems, and transfer switches (ATS/STS)
PDUs, RPPs, busways, and branch circuit installations
Grounding, bonding, and lightning protection systems
Verify compliance with construction drawings, specifications, method statements, and ITPs
Review and approve electrical material submittals, shop drawings, and as-built documentation
Witness factory acceptance tests (FAT), site acceptance tests (SAT), and commissioning activities
Identify non-conformances (NCRs), track corrective actions, and verify closeout
Coordinate with construction, commissioning, and design teams to resolve quality issues
Support integrated systems testing (IST) readiness and turnover documentation
Ensure compliance with applicable codes and standards (NEC, NFPA, IEEE, local AHJ requirements)
Maintain quality records, inspection reports, and turnover packages
Qualification
Required
Bachelor's degree in Electrical Engineering or equivalent
5+ years of experience in electrical construction QC, with a strong focus on data centers or mission-critical facilities
Proven experience inspecting critical power infrastructure and redundancy systems (N, N+1, 2N)
Strong knowledge of electrical codes, standards, and QA/QC procedures
Ability to read and interpret one-line diagrams, construction drawings, and technical specifications
Experience working with EPC contractors, subcontractors, and commissioning agents
Strong attention to detail and documentation accuracy
Assertive but collaborative communication style
Ability to work in fast-paced, schedule-driven construction environments
Strong problem-solving and organizational skills
Preferred
Professional Engineer (PE) license or equivalent
Experience with commissioning and integrated systems testing (IST)
Familiarity with BIM / Revit and electrical documentation platforms
Experience with hyperscale or colocation data center projects
Certification in Quality Management or Inspection (e.g., ISO 9001, CQE)
Company
SWJ TECHNOLOGY
SWJ TECHNOLOGY offers quality and equipment management, project management, and consulting services.
H1B Sponsorship
SWJ TECHNOLOGY has a track record of offering H1B sponsorships. Please note that this does not
guarantee sponsorship for this specific role. Below presents additional info for your
reference. (Data Powered by US Department of Labor)
Distribution of Different Job Fields Receiving Sponsorship
Represents job field similar to this job
Trends of Total Sponsorships
2025 (1)
2024 (2)
2023 (2)
2022 (3)
2021 (1)
2020 (3)
Funding
Current Stage
Growth StageCompany data provided by crunchbase