Electrical System Studies Engineer - Data Centers jobs in United States
cer-icon
Apply on Employer Site
company-logo

NEI Electric Power Engineering, Inc. · 1 day ago

Electrical System Studies Engineer - Data Centers

NEI Electric Power Engineering is an engineering services firm dedicated to serving people and solving problems. The Electrical System Studies Engineer will perform electrical power system modeling and analysis primarily for Data Center facilities, ensuring compliance with codes and maintaining strong client relationships.

Consumer ElectronicsElectrical DistributionElectronicsIndustrialOil and GasRenewable Energy
check
Growth Opportunities
badNo H1Bnote

Responsibilities

Creates and develops quality studies and reports including but not limited to short circuit, reactive power/load flow, arc flash, dynamic, transient, harmonic (pre & post), interconnection compliance, ampacity, grounding, as well as other related studies and calculations
Creates and prepares models required for utility interconnection process (CMLD, PSLF, PSSE, etc.). Assist clients with crafting assumptions required for utility load questionnaires
Assists with Client contacts and communication pertaining to specific assignments and meetings. Maintain strong and responsive Company-Client relationships
Maintains a strong understanding and applications of applicable Codes and Standards
Maintains high ethical and professional standards
Attends conferences, training workshops, seminars, regular undergraduate, and graduate classes as appropriate for advancement and as required to maintain quality of work
Attend safety training and follow safety rules and guidelines
May occasionally assist with performing equipment, control system, communications, troubleshooting, and relay field testing and start-up and commissioning services
Other job-related responsibilities as assigned
Secondary responsibilities may include checking and/or performing detailed design of all aspects of electrical power systems to include one-line diagrams, three-line diagrams, control and relaying schematics, wiring diagrams, SCADA, conduit, and cable sizing/routing, grounding design, writing of equipment specifications, project and construction cost estimates, and project scheduling

Qualification

Power system modelingETAPCymcapPSSeCDEGSEffective communicationInterpersonal skills

Required

Bachelor's in Electrical Engineering from an accredited institution, electric power option preferred
1 – 4 years of relevant engineering or field experience
Proficiency in power system modeling software such as: Cable Ampacity software: (Cymcap), Steady State software: (Required: PowerFactory or ETAP), System Protection & Arc Flash software: (Required: ETAP), Grounding software: (CDEGS or WinIGS), Possesses effective written and oral communications skills, Good interpersonal and people skills
Applicants must be currently authorized to work in the United States on a full-time basis

Preferred

Licensure: FE, PE is a plus, but not required
Nice to have: SKM Power Tools; Easypower; Aspen; Windmil for Steady State software
Nice to have: Easypower, CAPE, Aspen, Power Factory; SKM Power Tools for System Protection & Arc Flash software
Nice to have: PSSe, PSLF for Interconnection & Dynamic Modeling
Nice to have: PSCAD for Transient Studies software

Benefits

100% Employer paid team member premiums for Medical, Dental, Vision, Basic Life Insurance, and Long-Term Disability
Voluntary Life Insurance
401(k) with employer matching; 100% immediate vesting
Annual & discretionary bonus programs
Paid vacation and sick time
Employer paid licensure (FE/PE), certifications, seminars, & conferences
Paid parental leave
Tuition reimbursement
Eight (8) paid holidays including a floating holiday to use at your discretion
Annual Team Building
Hybrid work environment with remote flexibility
Career development, training, and coaching opportunities
Pet insurance

Company

NEI Electric Power Engineering, Inc.

twittertwitter
company-logo
NEI provides professional expertise and design engineering services for all aspects of power systems engineering.

Funding

Current Stage
Growth Stage

Leadership Team

leader-logo
Clifton Oertli
President & CEO
linkedin
leader-logo
Breck Robinson
Talent Acquisition Partner
linkedin
Company data provided by crunchbase