Amazon · 7 hours ago
Product Design Electrical Engineer, Data Center Engineering - Electrical Products and Services (DCE-EPS)
Amazon Data Services, Inc. is seeking a Product Design Electrical Engineer for their Electrical Products and Services team. The role involves leading the design and development of critical electrical power distribution equipment for AWS datacenters, ensuring compliance with various standards and collaborating with internal and external teams.
Artificial Intelligence (AI)DeliveryE-CommerceFoundational AIRetail
Responsibilities
Work with internal partner teams to solicit customer input and define design requirements for product design
Lead new product design, development and qualification of critical electrical power distribution equipment for AWS datacenters with primary focus on MV switchgear and transformers as well as connecting dependencies with LV switchgear and power distribution
Develop Capex and Opex spending budgets taking into account development costs with vendors, prototyping needs, testing and specialized tooling requirements
Work with global suppliers and manufacturers to specify appropriate electrical equipment and components, ensuring tier 2-3 supply chain resiliency
Ensure compliance with UL, CSA, IEC and federal, state and municipal requirements and building codes across different countries through appropriate levels of testing
Validate design through prototype, pre-production and first-of-kind builds, conducting DFx and value engineering analysis through each step and updating design and documentation
Work with field engineering and commissioning teams to properly test and validate installation, operation, and performance of electrical products
Ability to provide support for manufacturing activities for the new products on concurrent projects in multiple geographical locations
Be a leader within the product development team as well as within internal and external teams that support the data center
Qualification
Required
6+ years of data center design, construction, operations, or facility maintenance experience
Bachelor's degree in Engineering or a related field
Knowledge of critical data center mechanical and electrical equipment
Experience developing solutions and executing plans on complex projects
Experience in industrial or commercial engineering in mission critical facilities including but not limited to: data centers, power generation or oil and gas facilities
Experience researching new designs, technologies, and construction methods of data center equipment and facilities
Preferred
Professional Engineering or Architectural License
Knowledge of building codes and regulations for your region
Experience carrying design concepts through exploration, development, and into deployment or mass production
Experience reading, interpreting, and creating construction drawings, specifications, and submittal documents
Benefits
Health insurance (medical, dental, vision, prescription, Basic Life & AD&D insurance and option for Supplemental life plans, EAP, Mental Health Support, Medical Advice Line, Flexible Spending Accounts, Adoption and Surrogacy Reimbursement coverage)
401(k) matching
Paid time off
Parental leave
Company
Amazon
Amazon is a tech firm with a focus on e-commerce, cloud computing, digital streaming, and artificial intelligence.
H1B Sponsorship
Amazon has a track record of offering H1B sponsorships. Please note that this does not
guarantee sponsorship for this specific role. Below presents additional info for your
reference. (Data Powered by US Department of Labor)
Distribution of Different Job Fields Receiving Sponsorship
Represents job field similar to this job
Trends of Total Sponsorships
2025 (22803)
2024 (21175)
2023 (19057)
2022 (24088)
2021 (12233)
2020 (14881)
Funding
Current Stage
Public CompanyTotal Funding
$8.11BKey Investors
AmazonKleiner Perkins
2023-01-03Post Ipo Debt· $8B
2001-07-24Post Ipo Equity· $100M
1997-05-15IPO
Recent News
2026-01-25
2026-01-25
2026-01-25
Company data provided by crunchbase