Senior Product Lifecycle Electrical Engineer, Data Center Engineering - Electrical Products and Services (DCE-EPS) jobs in United States
cer-icon
Apply on Employer Site
company-logo

Amazon · 12 hours ago

Senior Product Lifecycle Electrical Engineer, Data Center Engineering - Electrical Products and Services (DCE-EPS)

Amazon Data Services, Inc. is seeking a Senior Product Lifecycle Electrical Engineer for their Electrical Products and Services team. The role involves leading the design and development of critical electrical power distribution equipment for AWS data centers, ensuring compliance with various regulations and collaborating with internal and external teams.

Artificial Intelligence (AI)DeliveryE-CommerceFoundational AIRetail
check
H1B Sponsor Likelynote

Responsibilities

Work with internal partner teams to solicit customer input and define design requirements for product design
Lead new product design, development and qualification of critical electrical power distribution equipment for AWS datacenters with primary focus on MV switchgear and transformers as well as connecting dependencies with LV switchgear and power distribution
Develop Capex and Opex spending budgets taking into account development costs with vendors, prototyping needs, testing and specialized tooling requirements
Work with global suppliers and manufacturers to specify appropriate electrical equipment and components, ensuring tier 2-3 supply chain resiliency
Ensure compliance with UL, CSA, IEC and federal, state and municipal requirements and building codes across different countries through appropriate levels of testing
Validate design through prototype, pre-production and first-of-kind builds, conducting DFx and value engineering analysis through each step and updating design and documentation
Work with field engineering and commissioning teams to properly test and validate installation, operation, and performance of electrical products
Ability to provide support for manufacturing activities for the new products on concurrent projects in multiple geographical locations
Be a leader within the product development team as well as within internal and external teams that support the data center

Qualification

Medium Voltage SwitchgearMedium Voltage TransformerElectrical Equipment ComplianceData Center DesignProject ManagementConstruction DrawingsResearch SkillsTeam LeadershipCommunication SkillsProblem Solving

Required

6+ years of data center design, construction, operations, or facility maintenance experience
Bachelor's degree in Engineering or a related field
Knowledge of critical data center mechanical and electrical equipment
Experience developing solutions and executing plans on complex projects
Experience in industrial or commercial engineering in mission critical facilities including but not limited to: data centers, power generation or oil and gas facilities
Experience researching new designs, technologies, and construction methods of data center equipment and facilities

Preferred

Professional Engineering or Architectural License
Knowledge of building codes and regulations for your region
Experience carrying design concepts through exploration, development, and into deployment or mass production
Experience reading, interpreting, and creating construction drawings, specifications, and submittal documents
Master's degree in Electrical Engineering or a related field

Benefits

Health insurance (medical, dental, vision, prescription, Basic Life & AD&D insurance and option for Supplemental life plans, EAP, Mental Health Support, Medical Advice Line, Flexible Spending Accounts, Adoption and Surrogacy Reimbursement coverage)
401(k) matching
Paid time off
Parental leave

Company

Amazon is a tech firm with a focus on e-commerce, cloud computing, digital streaming, and artificial intelligence.

H1B Sponsorship

Amazon has a track record of offering H1B sponsorships. Please note that this does not guarantee sponsorship for this specific role. Below presents additional info for your reference. (Data Powered by US Department of Labor)
Distribution of Different Job Fields Receiving Sponsorship
Represents job field similar to this job
Trends of Total Sponsorships
2025 (22803)
2024 (21175)
2023 (19057)
2022 (24088)
2021 (12233)
2020 (14881)

Funding

Current Stage
Public Company
Total Funding
$8.11B
Key Investors
AmazonKleiner Perkins
2023-01-03Post Ipo Debt· $8B
2001-07-24Post Ipo Equity· $100M
1997-05-15IPO

Leadership Team

leader-logo
Douglas J. Herrington
CEO, Worldwide Amazon Stores
linkedin
leader-logo
Werner Vogels
VP & CTO
linkedin
Company data provided by crunchbase