Structural Senior Project Manager jobs in United States
cer-icon
Apply on Employer Site
company-logo

PBK · 19 hours ago

Structural Senior Project Manager

PBK is an innovative structural engineering firm that empowers its employees to build strong relationships and deliver exceptional customer service. The Structural Senior Project Manager will manage the overall structural team, provide structural design, and coordinate project tasks internally and externally throughout the construction phase.

ArchitectureCivil EngineeringConsulting
check
Growth Opportunities

Responsibilities

Participate in coordination meetings with other disciplines and design review meetings with various supervisors, clients, and owners. Attend work sessions with various owner-client agencies to discuss scope of work and our structural design methodology
Coordinate the design and documentation required to complete the construction documents on a given project schedule and within the desired budget
Author and maintain structural specifications, select procedures for construction, determine materials and member sizes, and complete all necessary calculations needed for proper design
Shop drawing reviews, RFI’s (requests for information), change proposal requests, and change orders and incorporate changes into the project documents
Utilize written and verbal communication skills to relay and translate design and coordination items to project team members and author defensible engineering reports, memos, and email correspondence
Provide site observations / site walks during construction and author reports based on the walk / observation

Qualification

Structural Engineering licenseStructural design experienceProject team leadershipBuilding codes knowledgeETABSSAFERISARAMENERCALCExcelBluebeamDesign of structural materialsWritten communication skillsVerbal communication skills

Required

Bachelor's degree in civil engineering with Structural emphasis
Structural Engineering license, S.E. in your state of residence, if applicable
A minimum of 10 years of full-time progressive structural engineering experience is required
Strong understanding of state building codes and all applicable design codes including ASCE, AISC, ACI, MSJC, NDS, etc
Proficiency in common structural engineering and office tools including ETABS, SAFE, RISA, RAM, ENERCALC, Excel, Bluebeam, etc
Proficiency in design of various structural materials including steel, concrete, masonry, wood etc
Excellent written and verbal communications skills

Preferred

Master's degree is preferred
Three or more years of experience in multi-discipline project team leadership preferred
For California positions, experience working with the California Division of the State Architects (DSA) is highly desired

Benefits

Highly competitive salary and benefits package

Company

PBK

twittertwittertwitter
company-logo
PBK is an architecture and engineering firm that offers design and consulting services for public and private sectors.

Funding

Current Stage
Late Stage
Total Funding
unknown
2020-07-23Acquired

Leadership Team

leader-logo
Dan Boggio
Founder, President and CEO
linkedin
leader-logo
Roy Montalbano
President
linkedin
Company data provided by crunchbase