SIGN IN
Sr. Project Engineer jobs in United States
cer-icon
Apply on Employer Site
company-logo

Blackpeak · 12 hours ago

Sr. Project Engineer

Black-Peak Technology Inc is seeking a Senior Project Engineer who will be responsible for servicing and installing company machinery both in-house and at customer sites across North America. This role requires a hands-on approach with significant travel and involves mechanical assembly, troubleshooting, and customer collaboration.
Financial ServicesProfessional ServicesRisk ManagementSecurity
check
Culture & Values

Responsibilities

Mechanical assembly using a variety of hand tools and instruments
Troubleshoots electrical, pneumatic, and hydraulic control issues
Sets-up and run process lab metrology equipment with minimal direction
Designs simple tooling and fixtures as needed for production and test-work
Works wells with customer and engineering groups to solve problems on new and existing equipment
Installs and integrates new equipment at customer facilities, working independently and with support to resolve issues on site
Creates clear, concise spreadsheets for test-work and runoff data sets
Basic statistical process control knowledge in order to assess process capability
Works wells with customer and engineering groups to solve problems on new and existing equipment
Works with the documentation department to write work instructions and required sections of customer manuals in the time frame determined by the documentation department
Manages travel expenses to keep machine installation costs to a minimum

Qualification

MachiningCNCMechanical AssemblyMechanical troubleshootingElectrical troubleshootingPneumaticHydraulic controlsLabProduction machinesDesign toolingFixturesEnglish proficiencyCommunicationAttention to detailProblem solving

Required

Machining or CNC and Mechanical Assembly experience required
Strong mechanical troubleshooting skills (multi-axis machinery preferred)
Electrical troubleshooting skill is a plus
Must be able to troubleshoot pneumatic and hydraulic controls
Able to set-up and run lab and production machines with minimal direction
Understands basic functions and principles of superfinishing processes
Able to set-up and run process lab metrology equipment
Able to design simple tooling and fixtures as needed for production
Excellent communication skills (both oral and written communication)
Able to work independently with minimal oversight from manager
Able to apply strong attention to detail / problem solve
Able to speak/write in English (required)
Ability to travel to client sites 45% to 60% around the USA, Mexico & Canada, possibly Germany on occasion. (required)
Willingness to travel: 50% (Required)
Machining or CNC : 1 year (Required)
Mechanical Assembly : 1 year (Required)

Preferred

Bachelor's Degree in mechanical or electrical engineering, or a related field preferred
mechanical troubleshooting skills (multi-axis machinery ): 1 year (Preferred)
Electrical troubleshooting : 1 year (Preferred)
troubleshoot pneumatic and hydraulic controls: 1 year (Preferred)
to set-up and run lab and production machines : 1 year (Preferred)
design tooling and fixtures: 1 year (Preferred)

Benefits

401(k)
Health insurance
Paid time off
Vision insurance

Company

Blackpeak

twittertwittertwitter
company-logo
Blackpeak is an international investigative research and risk advisory firm dedicated to uncovering critical risk-related information.

Funding

Current Stage
Growth Stage
Total Funding
unknown
2019-03-20Acquired

Leadership Team

leader-logo
Jack Clode
Co-Founder and Managing Director
linkedin
Company data provided by crunchbase