SIGN IN
Sr. Project Engineer jobs in United States
cer-icon
Apply on Employer Site
company-logo

Antora Energy · 14 hours ago

Sr. Project Engineer

Antora builds and deploys thermal batteries to power always-on industrial operations with low-cost energy. The Sr. Project Engineer will be a key technical member of the team, responsible for coordinating engineering resources and ensuring project documentation is aligned for thermal energy storage projects.
EnergyEnergy StorageRenewable Energy
check
H1B Sponsor Likelynote

Responsibilities

Coordinate engineering resources, internal and external, to design, construct, commission, and troubleshoot the balance-of-plant system
Ensure project technical documentation (PFD’s, P&IDs, SLDs, Cause & Effect, etc) are aligned across Antora engineering and external parties; including change management, RFIs, and final as-built drawings. Work with document control resources to facilitate required engineering reviews prior to documents being issued for construction
Review discipline design deliverables (Mechanical, Structural, Electrical) to confirm design requirements are met and facilitate successful field implementation
Review or create construction work plans and submittal packages. Support generation of commissioning plans and hand-over of Inspection Test Plans (ITPs) to the commissioning team. Support engineering in handing over documentation to the plant operations team
Support the Supply Chain and Procurement teams by writing requests for proposals, reviewing quotes, and evaluating vendor technical capabilities
Collaborate with the Project Manager on project cost, schedule, and risks. Maintain the project action log and drive resolution of open items
Support engineering, construction, and commissioning phases of project by having an in-person presence for both ensuring proper coordination between technical resources and quality compliance to engineering design

Qualification

Project EngineeringConstruction ManagementTechnical DocumentationEPC Experience3D CADTechnical WritingVendor RelationsManaging ContractorsTeam Collaboration

Required

Bachelors or equivalent in an engineering field (e.g. civil, construction management, industrial, process, chemical, etc.) and/or 5+ years' experience in industrial project engineering (oil & gas, chemicals, power plants, etc.)
Have worked for, or with, EPC teams
Proficient in reading and interpreting construction plans and specifications. (PFD's, P&IDs, SLDs, Cause & Effect, etc)
Experience working independently, as well as working in a team-orientated and fast-paced startup-like environment

Preferred

Experience in construction and commissioning of process plants or other industrial facilities
Proficient in using construction estimating practices, software and tools (ACCE, ICARUS)
Familiarity with 3D CAD (Solidworks, Navisworks), 2D drawings (AutoCAD)
Have a PE in a related discipline
Technical writing: equipment specifications and technical reports
Vendor and client relations
Managing contractors

Benefits

Equity compensation in the form of stock options
A premium health benefits package with life and disability insurance
A 401K plan with employer contributions
Flexible spending accounts
An industry leading paid-time-off policy that features flexible and inclusive holiday observance
Paid volunteer time off

Company

Antora Energy

twittertwittertwitter
company-logo
Antora Energy is electrifying heavy industry with thermal energy storage for zero-carbon heat and power.

H1B Sponsorship

Antora Energy has a track record of offering H1B sponsorships. Please note that this does not guarantee sponsorship for this specific role. Below presents additional info for your reference. (Data Powered by US Department of Labor)
Distribution of Different Job Fields Receiving Sponsorship
Represents job field similar to this job
Trends of Total Sponsorships
2025 (1)
2024 (6)
2021 (1)

Funding

Current Stage
Growth Stage
Total Funding
$219.96M
Key Investors
ARPA-EDecarbonization PartnersCalifornia Energy Commission
2024-06-25Grant· $14.5M
2024-02-22Series B· $150M
2023-11-15Grant· $4M

Leadership Team

leader-logo
Andrew Ponec
Co-founder and CEO
linkedin
D
David Bierman
Co-Founder, Chief Commercial Officer
linkedin
Company data provided by crunchbase