SIGN IN
Project Engineer (Construction Change Orders) jobs in United States
cer-icon
Apply on Employer Site
company-logo

Atlantic Group · 10 hours ago

Project Engineer (Construction Change Orders)

Atlantic Group is seeking a Project Engineer (Construction Change Orders) to advance construction and infrastructure projects in Nassau County, NY. The role involves overseeing drawing revisions, managing change order coordination, and ensuring compliance while collaborating with project teams and preparing accurate as-built drawings.
B2BHuman ResourcesStaffing Agency
check
Growth Opportunities
check
H1B Sponsor Likelynote

Responsibilities

Document Control: Manage construction drawing revisions, including change orders, design clarifications, and modifications
Change Order Coordination: Collaborate with managers and engineers to assess changes and ensure accurate documentation
Project Collaboration: Work with construction managers, resident engineers, and project managers on drawing updates
Field Support: Provide inspectors with updated drawings and prepare revised as-built shop drawings
File Management: Maintain CAD/PDF files and hard copies of all drawings for compliance and accessibility

Qualification

Change order coordinationDesign-build experienceCAD softwareDocument management systemsMicrosoft Office SuiteMultitaskingAttention to detailVerbal communicationWritten communicationTeam collaboration

Required

Bachelor's degree in Engineering, Construction Management, or a related field is required
5+ years of engineering experience with demonstrated expertise in change order coordination, including required experience on DEP projects
Proficient in Microsoft Office Suite, CAD software, and document management systems
Strong understanding of design-build contract delivery, construction documentation processes, and drawing revision protocols
Highly organized with exceptional attention to detail, strong verbal and written communication skills, and the ability to multitask in a collaborative team environment

Company

Atlantic Group

twittertwitter
company-logo
Atlantic Group, founded in 2006, is an industry leader in executive and professional search & staffing.

H1B Sponsorship

Atlantic Group has a track record of offering H1B sponsorships. Please note that this does not guarantee sponsorship for this specific role. Below presents additional info for your reference. (Data Powered by US Department of Labor)
Distribution of Different Job Fields Receiving Sponsorship
Represents job field similar to this job
Trends of Total Sponsorships
2021 (1)
2020 (1)

Funding

Current Stage
Growth Stage

Leadership Team

leader-logo
John Ricco
Founding Partner
linkedin
Company data provided by crunchbase