SIGN IN
Downstream Technician jobs in United States
cer-icon
Apply on Employer Site
company-logo

Advanced Drainage Systems, Inc. · 1 day ago

Downstream Technician

Advanced Drainage Systems is a leading manufacturer of stormwater and onsite septic wastewater solutions, committed to sustainability and innovation. The Downstream Technician is responsible for the packaging, labeling, and visual quality inspection of products on the production line, while assisting Line Operators to meet production goals.
ConstructionEnergyIndustrialSustainabilityManufacturingWaste ManagementWater
check
H1B Sponsor Likelynote

Responsibilities

Embrace a culture of safety
Ensure quality by conducting final visual inspections and labeling all finished goods
Track quantity of units produced from the production line to ensure efficiency
Utilize standard operating procedures to package pipe to be delivered to customers
Maintain a safe working environment that includes the consistent use of Personal Protection Equipment to ensure your safety
Assist with line tooling changes, start-ups, shutdowns and down-stream equipment set-up
Ability to learn and stay current on pipe specifications and packaging requirements
Practice continuous improvement which not only includes the line but also facility housekeeping
Invest in your career with ADS. Build and maintain job skills and additional earning potential through company training programs

Qualification

Manufacturing experienceBasic Mathematical skillsDependabilityEnergeticSelf-motivatedTeam oriented

Required

Flexibility to work 40+ hours per week and weekends as required
Embrace a culture of safety
Ensure quality by conducting final visual inspections and labeling all finished goods
Track quantity of units produced from the production line to ensure efficiency
Utilize standard operating procedures to package pipe to be delivered to customers
Maintain a safe working environment that includes the consistent use of Personal Protection Equipment to ensure your safety
Assist with line tooling changes, start-ups, shutdowns and down-stream equipment set-up
Ability to learn and stay current on pipe specifications and packaging requirements
Practice continuous improvement which not only includes the line but also facility housekeeping
Invest in your career with ADS. Build and maintain job skills and additional earning potential through company training programs
Self-motivated and the ability to work independently
Energetic and thrive in a fast-paced environment
Dependability
Ability to learn new skills
Team oriented
Basic Mathematical skills
Ability to perform physical labor for extended periods of time in fluctuating temperatures
Position requires full range of body motion including twisting, bending, reaching, squatting and ability to mount/dismount industrial equipment and vehicles
Ability to stand and be mobile throughout an 8-12-hour shift
Ability to use hands, arms and legs to physically handle and transport finished goods

Preferred

Previous industrial or manufacturing experience

Benefits

Medical
Dental
Vision
Retirement Plan
Paid Holidays/ Vacation Days
Health and prescription drug plans
Telemedicine (with medical plan)
High-Deductible Health Plan (HDHP) and Health Savings Account (HSA)
Dental and vision plans
Virtual physical therapy
An employee assistance program (EAP)
Voluntary accident, critical illness, and hospital indemnification programs
Retirement 401k program with company match
An employee stock purchase plan (voluntary)
Financial wellness planning
Paid parental leave
Flexible spending accounts (FSA) for child care and health care
Short-term and long-term disability
Basic life insurance
Accidental death and dismemberment (AD&D)
Adoption financial reimbursement
Tuition reimbursement
Voluntary life insurance (for employees, spouses, and children)
Voluntary identity theft and fraud protection

Company

Advanced Drainage Systems, Inc.

twittertwittertwitter
company-logo
Headquartered in Hilliard Ohio, Advanced Drainage Systems, Inc (ADS) is the leading manufacturer of high performance thermoplastic corrugated pipe, providing a comprehensive suite of water management products and drainage solutions.

H1B Sponsorship

Advanced Drainage Systems, Inc. has a track record of offering H1B sponsorships. Please note that this does not guarantee sponsorship for this specific role. Below presents additional info for your reference. (Data Powered by US Department of Labor)
Distribution of Different Job Fields Receiving Sponsorship
Represents job field similar to this job
Trends of Total Sponsorships
2025 (4)
2024 (4)
2023 (5)
2022 (5)
2021 (1)
2020 (1)

Funding

Current Stage
Public Company
Total Funding
$850M
Key Investors
CPP Investments
2022-06-02Post Ipo Debt· $500M
2021-08-20Post Ipo Secondary· $350M
2014-07-25IPO

Leadership Team

leader-logo
Scott Cottrill
EVP, CFO and Treasurer
linkedin
leader-logo
Tim Makowski
VP, Controller & Chief Accounting Officer
linkedin
Company data provided by crunchbase